Timesheets and billable hours: a practical guide for Australian agencies
Nobody joined a creative agency to fill in timesheets. Yet hours are the one number that tells you whether a project made money. This guide keeps tracking light enough that people actually do it.
Why track at all
Hours are the link between what you charge and what the work cost you. Without them, profitability is a guess. With them, you can see that a $4,500 website took sixty hours and that the same client’s retainer is quietly eating ten more a month.
Billable and non-billable, kept separate
- Billable: work you charge for or that sits inside a fee, such as design, development, content loading and client calls on a project.
- Non-billable: internal meetings, pitching, admin, training and fixing your own mistakes.
- Both belong in the timesheet. A team that logs only billable hours hides the real cost of running the studio.
Make logging a ten-second job
- Start the timer on the project or deliverable you are working on, not in a separate tool.
- Log at the end of each work block, not at the end of the week.
- Use a short description such as “homepage build” rather than a paragraph.
- Set a Friday reminder: unlogged time is the biggest source of bad data.
Contractors and freelancers on an ABN
Many agencies bring in freelancers who work under their own ABN. Their hours still matter. Log them against the project so the margin reflects the true cost, even though they invoice you separately.
Give contractors a standard team role. They record their time, while approving hours, setting rates and building invoice drafts stay with the owner or a manager.
Read the team load weekly
Logged hours per person show who is over and who has room. A simple rule: if someone’s logged hours exceed their available week two weeks running, rebalance before something slips.
It also supports honest conversations at review time. A person who consistently logs a lot of non-billable time may be stuck in admin that someone else could take.
From hours to the invoice
Tracked hours become the basis for invoicing in your own invoicing tool. The agency system gives you clean numbers per project and per client, and you carry them across. That keeps GST, BAS and bookkeeping where they belong, with your accountant and your accounting software.
Rules that keep the data usable
- One timesheet for the whole team, using the same project and deliverable names.
- Round to a sensible increment, such as fifteen minutes, and stay consistent.
- Agree what counts as a client call so everyone logs it the same way.
- Correct mistakes in the week they happen, not at the end of the quarter.
Using the numbers in a review
At the end of each month, look at three figures per client: hours used, hours included and the share that was billable. A client who steadily uses 120 per cent of their included hours is telling you something, and so is one who uses 40 per cent.
Keep the conversation about the work, not about people. Tracked hours show where the process is slow, such as repeated revision rounds or unclear briefs, far more reliably than they show who is lazy.
What to do when someone resists
Some designers and developers worry that tracked time will be used to judge them. Say plainly what it is for: pricing future work properly, protecting the team from unrealistic deadlines and showing clients where the effort goes. Share the totals with the team each month, so the numbers feel like a shared tool rather than surveillance.
Start with the senior people. When the most experienced developer logs time without fuss, the rest follow.