Delivering web projects for Belize lodges, dive shops and tour operators
A website for a Placencia eco-lodge, a booking page for a San Pedro dive shop and a menu site for a restaurant in Dangriga share one delivery rhythm. This guide shows a repeatable path from kickoff to launch, and where Belizean projects tend to stall.
One path for every project
Use the same milestones each time: brief, sitemap, design, build, content, launch. When every project has the same shape, the person covering for a colleague on leave can pick any of them up without a long handover.
Add a visible status for “with the client for review”. It shows at a glance whether a delay is yours or theirs, which matters when the owner of a lodge answers messages only between guest check-ins.
Kickoff to launch in six steps
- Confirm scope, one owner on your side and one decision-maker on theirs.
- Split the work into deliverables a client can approve: sitemap, designs, staging build, photos and text loaded, final site.
- Give every milestone a date and every deliverable one owner.
- Send each deliverable for approval before starting what depends on it, and record the date of the decision.
- Run a launch checklist: forms, booking links, redirects, SSL and the domain pointing correctly.
- Close with a short note on what ran over hours and why.
Build the plan around the tourism year
How the year tends to shape client availability (typical pattern, not a rule)
| Period | What clients are doing | What it means for delivery |
|---|---|---|
| December to April | Peak visitor season, owners busy | Land approvals before the rush; keep requests short |
| May to early June | Quieter, time to plan | Good window for rebuilds and photo shoots |
| June to November | Rainy and hurricane season, slower trade | Offer redesigns and booking-flow improvements |
Practical realities to schedule around
- Connectivity on the cayes and in the south can be uneven, so ask for large photo sets early and agree how they will be sent.
- Storm warnings can close a lodge for days. Add slack to milestones in the wet months.
- Content is the usual bottleneck: set a date for photos and text at kickoff and record it as its own milestone.
- Public holidays, including September celebrations, can quietly remove a week from a schedule.
Approvals protect both sides
Record approval against the deliverable rather than in a thread of messages. When an owner says in week nine that they never saw the homepage design, you can show the date it was approved and by whom.
It also keeps scope honest. A change requested after approval is a new piece of work you can quote on its own rather than absorb.
Handover is part of the job
Agree at the start what the client receives at the end: logins, a short walkthrough, the domain and hosting details and a plain list of what any ongoing arrangement covers. A one-page summary on launch day, followed by a check-in two weeks later, turns a finished project into a retainer conversation instead of a surprise invoice.