Delivering web projects from Ebène to overseas clients: one path, English and French
Mauritius sits two to three hours ahead of France and four hours ahead of the UK in winter. That gap is an advantage when you finish a build at the end of your day and the client wakes up to it, and a trap when approvals drift for a week. Here is a delivery path built for that rhythm.
One path, whatever the client’s language
Use identical stages for every project: brief, structure, design, build, content, launch. The stage names can be written in English or French on the client side, but the stages themselves never change. A project manager in Curepipe can then pick up a build started by a colleague in Ebène without a briefing.
The status that matters most is “with the client”. It tells you instantly whether a delay is yours or theirs, which is the question every overseas client eventually asks.
Six steps from brief to launch
- Confirm scope, your named owner and the named decision-maker on the client side.
- Split the work into deliverables that can be approved: structure, designs, staging build, loaded content, final site.
- Give each milestone a date and each deliverable one owner.
- Send a deliverable for approval before starting work that depends on it.
- Run a launch checklist covering forms, redirects, analytics, SSL and where the domain points.
- Close with a short note on hours that went over and the reason.
Making approvals work across time zones
Ask for a decision by a fixed time on a fixed day, stated in the client’s own time zone. “By Thursday 17:00 Paris time” leaves no room for a polite misunderstanding.
Record the approval on the deliverable. When a client in London says in week eight that nobody showed them the homepage, you can point to the day it was approved and by whom. A change requested afterwards becomes a separate piece of work.
A calendar that includes two worlds
- Mauritian public holidays and festival days affect your team, while European summer holidays affect your clients. Plan around both.
- August is quiet in much of Europe, so aim to land approvals by the end of July.
- The financial year ends on 30 June, which brings a rush of requests from local companies in May and June.
- Cyclone season, roughly from the start of the year to April, can interrupt power and connectivity. Keep staging links and files reachable for remote work.
Handover is still part of delivery
Agree before the project starts what the client receives at handover: logins, a short walkthrough, domain and hosting details and what an ongoing arrangement covers. A Flic en Flac studio that hands a dive-centre owner a one-page summary on launch day will usually get a call about a retainer a fortnight later.
Where a week usually disappears
- Content that arrives late: give text and photos a milestone and a date at kickoff.
- Feedback in three languages from four people: name one person who consolidates comments.
- Unclear ownership: one owner per deliverable, even when two people work on it.
- Scope that grows in chat: log each request as a change and decide whether it fits this milestone.