Billable hours in a high-cost city: timesheets for Singapore agencies

← Blog
Guide • Time tracking

Billable hours in a high-cost city: timesheets for Singapore agencies

When a designer’s hour costs a studio real money, an untracked hour is a leak. Yet nobody opens a Tanjong Pagar studio to fill in timesheets. This guide keeps tracking light enough to survive a busy week while still giving you numbers you can price from.

Why the numbers matter more here

Hours link what you charge to what the work cost. In a market with high salaries and rents, a small drift in hours per project becomes a large drift in margin by the end of the year. A website that you believe took 70 hours may have taken 95 once calls, revisions and file wrangling are counted.

Tracked hours replace opinion with a figure, and they give you something factual to bring to the next quote.

Billable and non-billable, side by side

  • Billable: work sitting inside a fee, such as design, development, content loading and client calls on a project.
  • Non-billable: pitching, internal meetings, training, admin and fixing your own mistakes.
  • Log both. A team that records only billable time hides the true cost of running the studio.

What to log, and where

ActivityLog against
Homepage buildThe project and its deliverable
Weekly client callThe project or the retainer
Preparing a pitchInternal, non-billable
Freelancer’s hoursThe project, by the freelancer

Make logging a ten-second habit

  1. Log time against the project or deliverable you are on, not in a separate tool.
  2. Enter time at the end of each work block rather than on Friday evening.
  3. Use a short description such as “checkout page fixes”.
  4. Set a Friday reminder, since missing entries are the main source of bad data.

Freelancers and regional teammates

Singapore studios often bring in freelancers or an offshore developer to absorb peaks. Their hours belong on the project, so margin reflects true cost even though they invoice you separately. Give them a team role: they record time, while approving hours, setting rates and building invoice drafts stay with the owner or a manager.

Tracked hours then feed your own invoicing. The agency system gives you clean figures per project and client, and you carry them into whichever tool raises your invoices.

See also