Hours that add up: a timesheet habit for busy Nigerian agency teams

← Blog
Guide • Time tracking

Hours that add up: a timesheet habit for busy Nigerian agency teams

Nobody opens a creative studio to fill in timesheets. Yet hours are the one number that explains why a job made money or did not. This guide keeps tracking light enough that a team shuttling between Lekki and Ikeja, or between Wuse and Gwarinpa, will really keep it up.

Why bother with hours

Hours link what you charge to what the work cost. Without them, profitability is a hunch. With them you can see that a fixed-price shop build swallowed seventy hours and that the same client’s retainer eats a further twelve every month.

Billable and non-billable together

  • Billable: work you charge for or that sits inside a fee, such as design, development, loading content and project calls.
  • Non-billable: pitching, internal meetings, admin, training and fixing your own errors.
  • Record both. A team that logs only billable time hides what running the studio costs.

A ten-second habit

  1. Start the timer on the deliverable itself, not in a separate app.
  2. Log at the end of each work block, not on Friday afternoon.
  3. Write two or three words, such as “checkout copy”.
  4. Set a Friday reminder, because unlogged time is the main source of bad data.

When the light goes or the network drops

If a power cut or a network outage ends a work session, do not reconstruct it from memory on Monday. Note the start and end times on paper or in a phone note and enter them once you are back online. A rough but honest entry beats an empty day.

Agree one team rule for time lost to outages, for instance labelling it non-billable, so the data stays comparable from person to person.

Contractors and corps members

Many Nigerian studios lean on contract developers, interns and NYSC corps members alongside full-time staff. Their hours are real work and belong in the project totals, even when a contractor invoices you separately.

Give them a standard team role. They log time; approving hours, setting rates and building invoice drafts stay with the owner or a manager.

Three numbers to review each month

A simple monthly look per client

FigureWhat it tells you
Hours usedHow much work the client truly consumed
Hours includedWhat the retainer was meant to cover
Billable shareHow much of the effort sat inside the fee

From hours to your own invoice

Recorded hours give you tidy figures per project and per client. You take them into your own invoicing, where currency, tax and bookkeeping follow the rules your accountant uses. Keeping the two jobs separate keeps each one clean.

See also