The one-page monthly client report: a format for Nigerian retainers
A busy client in Victoria Island or Port Harcourt gives your report about ten seconds between meetings. A good monthly report respects that: what you did, what it cost in hours, what you need back. This layout fits on one page and works for a retainer of any size.
Three lines the client can repeat
Open with what was delivered, what is under way and what you need from the client. If a managing director reads nothing else, those lines still keep them informed.
A page that holds together
- Delivered this month: finished deliverables and change requests.
- Hours used against the retainer, for example 9 of 12 included.
- In progress: deliverables under way and their due dates.
- Needs you: approvals or content you are waiting for.
- Coming up: next month’s plan and any domain or hosting renewal within sixty days.
Built to be read on a phone
Most clients will open your report on a phone, in traffic or between sessions, often over mobile data. Keep it short, skip heavy images and put the single request at the bottom. When you share the report, you copy the link and send it yourself, on whichever channel that client actually answers.
The platform produces the report on request from recorded data. It sends nothing on your behalf, so the conversation stays with you.
Say why the hours moved
Raw numbers invite questions. If a retainer used 15 of 12 hours, say what drove it, perhaps an urgent landing page before a campaign launch, and say what you propose for next month. Clients accept an overrun they understand far more readily than one they discover on an invoice.
Where each section comes from
Sources for a monthly report
| Section | Source |
|---|---|
| Hours | Tracked time |
| Deliverable status | The project |
| Renewal dates | The domain and hosting list |
Bad news goes up top
If something slipped, say what, why and the new date in the first lines. A client who reads about a two-day delay early, with a plan attached, stays calm. One who finds it in paragraph six does not.