Billable hours in a Zambian studio: logging time people will actually do

← Blog
Time • Billable hours

Billable hours in a Zambian studio: logging time people will actually do

Timesheets have a bad name because they are usually introduced as a control. They work when they are introduced as a way to protect the team from unfair deadlines and the studio from unpaid work. Here is a version that a small Lusaka or Copperbelt team can keep up.

Sell the purpose before the habit

Tell the team what the hours are for: pricing the next job properly, seeing who is overloaded and showing a client what a retainer covered. Hours used to blame individuals are quickly falsified; hours used to fix estimates are quickly respected.

Start with the numbers about the studio, not about people. Show the team which client absorbed the most unpaid hours last month and ask for ideas.

What to mark as billable

  • Billable: design, development, content loading, client calls and revisions that fall within a project or a retainer.
  • Non-billable: proposals and pitches, internal meetings, learning, admin and fixing your own mistakes.
  • Both belong in the sheet. If only billable time is logged, the cost of running the studio stays invisible.

Three ways to log, compared

Rhythm and reliability

Timer on the taskEnd of the dayEnd of the week
AccuracyHighestGoodWeak
Effort for the personA click or twoFive minutesPainful on Friday
SuitsRetainer workMost small teamsNobody, in practice

Handling interruptions in the real world

Power cuts, a slow connection or a long drive into town break up the day. Do not pretend a day was eight clean hours. Log what was done, add a short note such as “offline, content prep” and keep going.

Over a quarter, those notes show how much capacity the studio really has, which is more useful than a perfect timesheet that nobody believes.

Freelancers and student interns

Many studios use freelancers for design or development and interns from nearby colleges. Their hours still belong in the project cost. Give them the standard team role: they log time, while approving hours, setting rates and building invoice drafts stay with the owner or a manager.

A fifteen-minute monthly review

  1. Open hours by client and note any client above the hours their fee supports.
  2. Open hours by project and note any job over its estimate.
  3. Open billable against non-billable by person and ask what is taking the non-billable share.
  4. Choose one change for next month, for example a cap on revisions.

See also